THE EXCHANGE BLDG. & INTERCHANGE BLDG. SKYWALK (FROM ASOK STAION ACROSS ASOK INTERSECTION) ON SUKHUMVIT RD. BANGKOK THAILAND
- UNDERGROUND & OVERHEAD UTILITY DIVERGENCE
- THE DIA.600 MM. BOREPILE & RC. FOOTING ALONG THE SUKHUMVIT RD.
- THE PRE-FABRICATION & ERECTION STEEL STRUCTURE 117 M. LONG FOR SKYWALK BENEATH BTS. ALONG THE SUKHUMVIT RD.
- THE PRE-FABRICATION & ERECTION STEEL STRUCTURE BRIDGE ONE PSAN 40 M. LONG ACROSS THE ASOK INTERSECTION
- THE PRE-FABRICATION & ERECTION STEEL STRUCTURE 2 STAIRCASE
- ALL OF ARCHITECTURAL WORK
- ELECTRICAL SYSTEM INSTALLATION